Contact the appeal

John Mulvey
56 Upper Gungate
Tamworth
B79 8AA

Tel: 07760 367570
Email: mfjohn1@ntlworld.com

Friday 8 January 2016

Tower Electrics Having a Makeover

Yesterday I called in at St Peter's to see the progress with upgrading the electrics in the tower. Matt, the electrician, had made good progress. The new dual strip light and emergency lighting had been fitted in the ringing room. The whole staircase was now equipped with bulkhead lights and there were now no dark patches. The clockroom had been equipped with new lighting to illuminate the whole space. A new floodlight to illuminate the whole of the belfry was just being installed, together with electric sockets for ease of maintenance.


To be completed was wiring these circuits into a new consumer unit in the church which will ensure that the electrics in the tower can be extended if necessary in the future.



This is the emergency light in the ringing room. It will ensure that if the power goes off. This will switch on and ensure the ringers can catch their ropes.

No comments:

Post a Comment